-
Construction of Musakhail Taunsa road stretch to be constructed and linked with Zhob (Package 2 and 3)
Duration: 2017 to Sept 2018
-
Fields of Activity
1. Drainage
2. Infrastructure
3. Roads
4. Sewerage Systems
5. Water Supply System
6. Electrical
7. Struture
8. Bridge





